Atlantis Resort – “The Reef” Paradise Island, Bahamas


Scope:

  • 495 Rooms
  • 495 Bose 3.2.1 Surround Sound Systems
  • 1178 LG Plasma Displays
  • 495 Active Thermal Management
    “Cool Vent II” Fan Packs

GCTS provided:

  • Project Management and Consultation for entire In-Room AV Systems Installation
  • Design/ReDesign of all In-Room AV Systems
  • Installation of all interface wiring
  • Installation of all In-Room Bose Surround Sound Systems
  • Installation of all LG Plasma displays and brackets
  • Design and Installation of thermal management systems
  • Final calibration and commissioning of all In-Room AV Systems
  • Development of troubleshooting protocols and manuals for Atlantis Engineering Staff
  • Development of ‘as-built’ drawings for Atlantis Development Department
  • Final sign-off for all other contractors related to the In-Room AV Systems (IT Infrastructure, Content Providers, and Millwork)

Time Frame: August 1,2007 – December 15, 2007

©2015 Copyright Gulf Coast Technical Services